参考文献
[1] 黄新波.输电线路在线监测与故障诊断[M].2版.北京:中国电力出版社,2014:361-362.
[2] ALBERMANI F,KITIPORNCHAI S.Failure ANSYS of transmission towers[J].Engineering Failure Analysis,2009,10(16):1922-1930.
[3] MOON B W,PARK J H,LEE S K,et al.Performance evaluation of a transmission tower by substructure test[J].Journal of Constructional Steel Research,2009,65(1):1-11.
[4] 李淮海,王璋奇,李恒遥,等.适应基础沉降的高度可调铁塔结构设计及试验研究[J].电网技术,2007,31(19):83-86.
[5] 张建强,杨昆,王予东,等.煤矿采空区地段高压输电线路铁塔地基处理的研究[J].电网技术,2006,30(2):30-34.
[6] 熊卫红,刘先珊,李正良,等.500kV输电线路基础沉降铁塔的可靠度分析[J].电力建设,2015,36(2):41-47.
[7] WANG Z Q,JIANG W Q.The influence of tower foundation settlement on the sag and stress of overhead lines[C]//Inter-national Conference on Energy and Environment Technology. Guangxi,China:IEEE,2009:340-343.
[8] YANG F,YANG J,HAN J,et al. Study on the limited values of foundation deformation for a typical UHV transmission tower[J].IEEE Transactions on Power Delivery,2010,25(4):2752-2758.
[9] 李清华,杨靖波.特高压输电杆塔动力特性分析快速建模研究[j].电力建设,2006,27(5):5-7.
[10] 周柯宏,张烨,舒佳,等.输电线路杆塔倾斜度在线监测系统[J].广东电力,2013,26(7):57-60.